Benefit evaluation for off‐site production in construction N Blismas, C Pasquire, A Gibb Construction management and Economics 24 (2), 121-130, 2006 | 438 | 2006 |
Target value design: using collaboration and a lean approach to reduce construction cost D Zimina, G Ballard, C Pasquire Construction management and economics 30 (5), 383-398, 2012 | 385 | 2012 |
Constraints to the use of off-site production on construction projects NG Blismas, M Pendlebury, A Gibb, C Pasquire Architectural engineering and design management 1 (3), 153-162, 2005 | 240 | 2005 |
Revolutionize value management: A mode towards sustainability NZ Abidin, CL Pasquire International Journal of Project Management 25 (3), 275-282, 2007 | 212 | 2007 |
Delivering sustainability through value management: Concept and performance overview N Zainul Abidin, CL Pasquire Engineering, Construction and Architectural Management 12 (2), 168-180, 2005 | 182 | 2005 |
Drivers for dynamic brief development in construction AAE Othman, TM Hassan, CL Pasquire Engineering, Construction and Architectural Management 11 (4), 248-258, 2004 | 116 | 2004 |
Considerations for as CL Pasquire, AGF Gibb cс Emerald, 2002 | 111 | 2002 |
Leaner construction through off-site manufacturing CL Pasquire, GE Connolly Proceedings IGLC, Gramado, Brazil, 263-266, 2002 | 101 | 2002 |
Value theory in lean construction J Salvatierra‐Garrido, C Pasquire Journal of Financial Management of Property and construction 16 (1), 8-18, 2011 | 97 | 2011 |
The relationship between the Last Planner® System and collaborative planning practice in UK construction EI Daniel, C Pasquire, G Dickens, HG Ballard Engineering, construction and architectural management 24 (3), 407-425, 2017 | 86 | 2017 |
Exploring the implementation of the Last Planner® System through IGLC community: twenty one years of experience EI Daniel, C Pasquire, G Dickens Nottingham Trent University, 2015 | 77 | 2015 |
Analysis of factors that drive brief development in construction AAE Othman, TM Hassan, CL Pasquire Engineering, Construction and Architectural Management 12 (1), 69-87, 2005 | 70 | 2005 |
APPENDIX A Lean Project Delivery–innovation in integrated design & delivery A Mossman, G Ballard, C Pasquire The Design Manager’s Handbook 164, 164-192, 2013 | 60 | 2013 |
What should you really measure if you want to compare prefabrication with traditional construction C Pasquire, A Gibb, N Blismas Proceedings IGLC 13, 481-491, 2005 | 55 | 2005 |
Exploring value concept through the iglc community: Nineteen years of experience J Salvatierra-Garrido, C Pasquire, L Miron Proceedings for the 20th Annual Conference of the International Group for …, 2012 | 49 | 2012 |
Lean construction trial on a highways maintenance project M Ansell, M Holmes, RJE Evans, CL Pasquire, A Price Loughborough University, 2007 | 44 | 2007 |
The 8th flow-common understanding CL Pasquire Nottingham Trent University, 2012 | 43 | 2012 |
Creating social value within the delivery of construction projects: the role of lean approach EI Daniel, C Pasquire Engineering, construction and architectural management 26 (6), 1105-1128, 2019 | 41 | 2019 |
Off-site production: evaluating the drivers and constrains CL Pasquire, AGF Gibb, N Blismas Nottingham Trent University, 2004 | 41 | 2004 |
Behavioral research in appraisal J Diaz, CL Pasquire London: RICS Foundation, 2002 | 41 | 2002 |