Marco Schutten
Marco Schutten
Universitair Hoofddocent, Universiteit Twente
Verified email at utwente.nl - Homepage
Title
Cited by
Cited by
Year
Vehicle routing under time-dependent travel times: the impact of congestion avoidance
AL Kok, EW Hans, JMJ Schutten
Computers & operations research 39 (5), 910-918, 2012
1562012
A dynamic programming heuristic for the vehicle routing problem with time windows and European Community social legislation
AL Kok, CM Meyer, H Kopfer, JMJ Schutten
Transportation Science 44 (4), 442-454, 2010
117*2010
Practical job shop scheduling
JMJ Schutten
Annals of Operations Research 83, 161-178, 1998
931998
Parallel machine scheduling with release dates, due dates and family setup times
JMJ Schutten, RAM Leussink
International journal of production economics 46, 119-125, 1996
861996
Joint optimization of level of repair analysis and spare parts stocks
RJI Basten, MC Van der Heijden, JMJ Schutten
European Journal of Operational Research 222 (3), 474-483, 2012
772012
List scheduling revisited
JMJ Schutten
Operations Research Letters 18 (4), 167-170, 1996
731996
Inventory routing for dynamic waste collection
M Mes, M Schutten, AP Rivera
Waste management 34 (9), 1564-1576, 2014
722014
Single-machine scheduling with release dates, due dates and family setup times
JMJ Schutten, SL Van de Velde, WHM Zijm
Management Science 42 (8), 1165-1174, 1996
701996
Waiting profiles: An efficient protocol for enabling distributed planning of container barge rotations along terminals in the port of Rotterdam
A Douma, M Schutten, P Schuur
Transportation Research Part C: Emerging Technologies 17 (2), 133-148, 2009
632009
Restricted dynamic programming: a flexible framework for solving realistic VRPs
J Gromicho, JJ van Hoorn, AL Kok, JMJ Schutten
Computers & operations research 39 (5), 902-909, 2012
622012
Optimizing departure times in vehicle routes
AL Kok, EW Hans, JMJ Schutten
European Journal of Operational Research 210 (3), 579-587, 2011
602011
An efficient model formulation for level of repair analysis
RJI Basten, JMJ Schutten, MC Van Der Heijden
Annals of Operations Research 172 (1), 119, 2009
562009
Linear-programming-based heuristics for project capacity planning
N Gademann, M Schutten
Iie Transactions 37 (2), 153-165, 2005
552005
Time-constrained project scheduling
TA Guldemond, JL Hurink, JJ Paulus, JMJ Schutten
Journal of Scheduling 11 (2), 137-148, 2008
482008
A minimum cost flow model for level of repair analysis
RJI Basten, MC Van der Heijden, JMJ Schutten
International Journal of Production Economics 133 (1), 233-242, 2011
432011
A dynamic programming heuristic for vehicle routing with time-dependent travel times and required breaks
AL Kok, EW Hans, JMJ Schutten, WHM Zijm
Flexible Services and Manufacturing Journal 22 (1), 83-108, 2010
422010
A decision support system for ship maintenance capacity planning
R De Boer, JMJ Schutten, WHM Zijm
CIRP Annals 46 (1), 391-396, 1997
401997
An approximate approach for the joint problem of level of repair analysis and spare parts stocking
RJI Basten, MC Van der Heijden, JMJ Schutten, E Kutanoglu
Annals of operations research 224 (1), 121-145, 2015
352015
Inventory reduction in spare part networks by selective throughput time reduction
MC van der Heijden, EM Alvarez, JMJ Schutten
International journal of production economics 143 (2), 509-517, 2013
352013
Time-constrained project scheduling with adjacent resources
JL Hurink, AL Kok, JJ Paulus, JMJ Schutten
Computers & operations research 38 (1), 310-319, 2011
332011
The system can't perform the operation now. Try again later.
Articles 1–20