Real-time reconfigurable scheduling of multiprocessor embedded systems using hybrid genetic based approach H Gharsellaoui, I Ktata, N Kharroubi, M Khalgui 2015 IEEE/ACIS 14th International Conference on Computer and Information …, 2015 | 6 | 2015 |
Prediction performance method for dynamic task scheduling, case study: the ollaf architecture I Ktata, F Ghaffari, B Granado, M Abid 2010 5th International Design and Test Workshop, 97-102, 2010 | 2 | 2010 |
Adapted method of slideshow processing T Ouni, I Ktata, M Abid | 1 | 2014 |
Novel Approach for Modeling Very Dynamic and Flexible Real Time Applications. I Ktata, F Ghaffari, B Granado, M Abid ReCoSoC, 21-27, 2010 | 1 | 2010 |
A Model-Driven Approach for Reconfigurable Systems Development I Ktata, N Kharroubi Advances in Science, Technology and Engineering Systems Journal 5 (6), 801-810, 2020 | | 2020 |
Réalisation d'un système d'exploitation pour l'architecture reconfigurable dynamiquement OLLAF I Ktata Université de Cergy Pontoise; École nationale d'ingénieurs de Sfax (Tunisie), 2013 | | 2013 |
Research Article Dynamic Application Model for Scheduling with Uncertainty on Reconfigurable Architectures I Ktata, F Ghaffari, B Granado, M Abid | | 2011 |
Dynamic application model for scheduling with uncertainty on reconfigurable architectures I Ktata, F Ghaffari, B Granado, M Abid International Journal of Reconfigurable Computing 2011, 1-15, 2011 | | 2011 |
2010 5th International Design and Test Workshop (IDT 2010) A Dhabi | | 2010 |
Dynamic Application Model for Scheduling with Uncertainty on Reconfigurable Architectures K Ismail, G Fakhreddine, G Bertrand, A Mohamed International Journal of Reconfigurable Computing 2011, 0 | | |