J.S.J. Koolwijk
Titel
Geciteerd door
Geciteerd door
Jaar
Inleiding bouwmanagement
JWF Wamelink
VSSD, 2009
482009
Collaboration and Integration in Project-Based Supply Chains in the Construction Industry
Koolwijk, J.S.J., Van Oel, C.J., Wamelink, J.W.F., Vrijhoef, R.
Journal of Management in Engineering 34 (3), 04018001, 2018
292018
Alternative Dispute Resolution Methods Used in Alliance Contracts
JS Koolwijk
Journal of Professional Issues in Engineering Education and Practice 132 (1 …, 2006
182006
Inventory of international reforms in building and construction
GKI Ang, RG Courtney, D Spekkink, I de Kort, JSJ Koolwijk
PSIB, PP1, 2004
152004
Projectalliantie: Procesinnovatie bij complexe bouwprojecten
JSJ Koolwijk, RP Geraedts
Delft VSSD, 2006
14*2006
Briefing: static or dynamic?
M Prins, J Koolwijk, L Volker, JWF Wamelink
Proceedings of the joint CIB, Tensinet, IASS international conference on …, 2006
82006
Integrated project delivery: the designer as integrator
JWF Wamelink, JSJ Koolwijk, A Van Doorn
Proceedings of the joint CIB international symposium Management of …, 2012
72012
Risks shared and allocated by construction clients and contractors in Dutch (hybrid) project alliances
JSJ Koolwijk
CIB World Congress 2010, Building a Better World, 301-307, 2010
62010
PARTNERING IN CONSTRUCTION: A FIELD STUDY TO FURTHER DEVELOP THE FRAMEWORK OF SUPPLY CHAIN INTEGRATION
JSJ Koolwijk, C Oel, van, R Vrijhoef, JWF Wamelink
Association of Researchers in Construction Management Conference (ARCOM …, 2015
52015
Procurement strategies for dynamic control of construction projects and supply chain
JSJ Koolwijk, R Vrijhoef
Advancing facilities mamagement and construction through innovation, 2005
42005
Developing a monitor for the characterisation of supply chain collaboration and the measurement of its effectiveness in the Dutch social housing sector
R Vrijhoef, J Koolwijk, R Van der Kuij, C Van Oel, H Wamelink
In proceeding of: The CIB W55/65/89/92/102/117& TG72/81/83 International …, 2014
32014
Prequalification of contractors based on past performance
J Koolwijk, RP Geraedts, MAB Chao-Duivis
Delft: Kenniscentrum Bouwprocesinnovatie, 2005
22005
The National Museum of Austrialia; uitwerking van een'volledige'Projectalliantie bij een utiliteitsbouwproject
JSJ Koolwijk
12003
Moduleboek M2 002 Ontwikkelen
RP Geraedts
TU Delft, 2001
12001
No-Blame Culture and the Effectiveness of Project-Based Design Teams in the Construction Industry: The Mediating Role of Teamwork
Koolwijk, J.S.J., Van Oel, C.J., Gaviria Moreno, J.C.
Journal of Management in Engineering 36 (4), 13, 2020
2020
De proefwoning als platform voor kennisintegratie in ketensamenwerking
J Koolwijk, H Hoepel
https://www.renda.nl/proefwoning_voor_kennisintegratie, 2016
2016
Ketenpartnerselectie
JSJ Koolwijk
http://www.noorderberg.nl/wat-we-doen/ketenpartnerselectie, 2015
2015
Leveranciersbeoordeling logisch vervolg op ketensamenwerking
JSJ Koolwijk, J Vlerken, van
http://www.noorderberg.nl/nieuws/leveranciersbeoordeling-logisch-vervolg-op …, 2015
2015
Meetinstrument voor Leveranciersbeoordeling
JSJ Koolwijk, J Van Vlerken
http://www.noorderberg.nl/Default.asp?Page=147, 2015
2015
Supply chain partnership in construction a field study on project team level factors
JSJ Koolwijk, CJ Van Oel, JWF Wamelink
IBEA Publications Ltd. London, UK, 2015
2015
Het systeem kan de bewerking nu niet uitvoeren. Probeer het later opnieuw.
Artikelen 1–20