An updated survey of variants and extensions of the resource-constrained project scheduling problem S Hartmann, D Briskorn European Journal of operational research 297 (1), 1-14, 2022 | 1444 | 2022 |
Experimental investigation of heuristics for resource-constrained project scheduling: An update R Kolisch, S Hartmann European Journal of Operational Research 174 (1), 23-37, 2006 | 1071 | 2006 |
Heuristic algorithms for the resource-constrained project scheduling problem: Classification and computational analysis R Kolisch, S Hartmann Project scheduling, 147-178, 1999 | 991 | 1999 |
A competitive genetic algorithm for resource‐constrained project scheduling S Hartmann Naval Research Logistics (NRL) 45 (7), 733-750, 1998 | 889 | 1998 |
Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem S Hartmann, R Kolisch European Journal of Operational Research 127 (2), 394-407, 2000 | 693 | 2000 |
Project scheduling with multiple modes: A genetic algorithm S Hartmann Annals of Operations Research 102, 111-135, 2001 | 491 | 2001 |
A self‐adapting genetic algorithm for project scheduling under resource constraints S Hartmann Naval Research Logistics (NRL) 49 (5), 433-448, 2002 | 451 | 2002 |
An exact algorithm for project scheduling with multiple modes A Sprecher, S Hartmann, A Drexl OR spectrum 19 (3), 195-203, 1997 | 305 | 1997 |
Project scheduling with multiple modes: A comparison of exact algorithms S Hartmann, A Drexl Networks 32 (4), 283-297, 1998 | 242 | 1998 |
Project scheduling under limited resources: models, methods, and applications S Hartmann Springer Verlag, 1999 | 222 | 1999 |
Generating scenarios for simulation and optimization of container terminal logistics S Hartmann OR Spectrum 26 (2), 171-192, 2004 | 174 | 2004 |
Inventory-based dispatching of automated guided vehicles on container terminals D Briskorn, A Drexl, S Hartmann OR Spectrum 28 (4), 611-630, 2006 | 161 | 2006 |
A general framework for scheduling equipment and manpower at container terminals S Hartmann OR Spectrum 26 (1), 51-74, 2004 | 137 | 2004 |
Project scheduling with resource capacities and requests varying with time: a case study S Hartmann Flexible Services and Manufacturing Journal 25 (1), 74-93, 2013 | 77 | 2013 |
A note on “Hierarchical models for multi-project planning and scheduling” S Hartmann, A Sprecher European Journal of Operational Research 94 (2), 377-383, 1996 | 60 | 1996 |
Packing problems and project scheduling models: an integrating perspective S Hartmann Journal of the Operational Research Society 51, 1083-1092, 2000 | 46 | 2000 |
Scheduling reefer mechanics at container terminals S Hartmann Transportation Research Part E: Logistics and Transportation Review 51, 17-27, 2013 | 38 | 2013 |
Time-Varying Resource Requirements and Capacities S Hartmann Handbook on Project Management and Scheduling Vol. 1, 163-176, 2015 | 37 | 2015 |
Simulating dispatching strategies for automated container terminals D Briskorn, S Hartmann Operations Research Proceedings 2005, 97-102, 2006 | 24 | 2006 |
Simulation of container ship arrivals and quay occupation S Hartmann, J Pohlmann, A Schönknecht Handbook of Terminal Planning, 135-154, 2011 | 22 | 2011 |