Follow
Peng Yu
Peng Yu
Unknown affiliation
No verified email
Title
Cited by
Cited by
Year
Fuzzy MILP unit commitment incorporating wind generators
B Venkatesh, P Yu, HB Gooi, D Choling
IEEE Transactions on power systems 23 (4), 1738-1746, 2008
1342008
Optimal location and sizing of fault current limiters in mesh networks using iterative mixed integer nonlinear programming
P Yu, B Venkatesh, A Yazdani, BN Singh
IEEE Transactions on Power Systems 31 (6), 4776-4783, 2016
822016
A practical real-time OPF method using new triangular approximate model of wind electric generators
P Yu, B Venkatesh
IEEE Transactions on Power Systems 27 (4), 2036-2046, 2012
212012
Effects of security constraints on unit commitment with wind generators
D Choling, P Yu, B Venkatesh
2009 IEEE Power & Energy Society General Meeting, 1-6, 2009
132009
Fuzzy security constraints for unit commitment with outages
P Yu, B Venkatesh
IET Generation, Transmission & Distribution 7 (12), 1516-1526, 2013
72013
Fast security and risk constrained probabilistic unit commitment method using triangular approximate distribution model of wind generators
P Yu, B Venkatesh
IET Generation, Transmission & Distribution 8 (11), 1778-1788, 2014
62014
Probabilistic evaluation and planning of power transmission system reliability
SB Makvand, B Venkatesh, D Cheng, P Yu
IET Generation, Transmission & Distribution 11 (5), 1119-1125, 2017
12017
Security constrained stochastic power system scheduling algorithms - with wind electric generators
P Yu
Ryerson University, 2014
12014
A practical real-time OPF method using new triangular approximate model of wind electric generators
B Venkatesh, P Yu
2013 IEEE Power & Energy Society General Meeting, 1-1, 2013
12013
Triangular approximate distribution model of wind electric generators
P Yu, B Venkatesh
2012 10th International Power & Energy Conference (IPEC), 150-154, 2012
12012
A proof-of-concept approach to Unit Commitment using the theory of complementarity
SV Craig, B Venkatesh, P Yu
2015 IEEE Electrical Power and Energy Conference (EPEC), 93-98, 2015
2015
Unit commitment with wind generators fuzzy/mixed integer linear programming
P Yu
Masters Abstracts International 48 (06), 2008
2008
The system can't perform the operation now. Try again later.
Articles 1–12