2D numerical simulations of soil nail walls VP Singh, GL Sivakumar Babu Geotechnical and Geological Engineering 28 (4), 299-309, 2010 | 159 | 2010 |
Simulation of soil nail structures using PLAXIS 2D GL Sivakumar Babu, VP Singh Plaxis Bulletin Spring issue, 16-21, 2009 | 79* | 2009 |
Reliability-based load and resistance factors for soil-nail walls GL Sivakumar Babu, VP Singh Canadian Geotechnical Journal 48 (6), 915-930, 2011 | 51 | 2011 |
Reliability analysis of soil nail walls GL Sivakumar Babu, VP Singh Georisk: Assessment and Management of Risk for Engineered Systems and …, 2009 | 49* | 2009 |
Numerical analyses of performance of soil nail walls in seismic conditions GL Sivakumar Babu, VP Singh ISET Journal of Earthquake Technology 45 (1-2), 31-40, 2008 | 41 | 2008 |
Soil nails field pullout testing: evaluation and applications GL Sivakumar Babu, VP Singh International Journal of Geotechnical Engineering 4 (1), 13-21, 2010 | 24 | 2010 |
Appraisal of soil nailing design GL Sivakumar Babu, VP Singh Indian Geotechnical Journal 39 (01), 81-95, 2009 | 21* | 2009 |
Deformation and stability regression models for soil nail walls GL Sivakumar Babu, VP Singh Proceedings of the Institution of Civil Engineers - Geotechnical Engineering …, 2009 | 13 | 2009 |
Reliability analyses of a prototype soil nail wall using regression models GL Sivakumar Babu, VP Singh Geomechanics and Engineering 2 (2), 71-88, 2010 | 10 | 2010 |
Stabilization of vertical cut using soil nailing GLS Babu, VP Singh Plaxis Bulletin, 6-9, 2007 | 9 | 2007 |
Reliability based stability assessment of natural slopes VP Singh Indian Geotechnical Journal 49 (6), 698–707, 2019 | 8 | 2019 |
Soil nailing for rehabilitation of reinforced earth wall distress GL Sivakumar Babu, VP Singh, BRS Murthy Proceedings of the ICE-Ground Improvement 164 (4), 235-244, 2011 | 6 | 2011 |
Reliability based study on seismic stability of soil nail walls GL Sivakumar Babu, VP Singh Journal of Southeast Asian Geotech Society 40 (04), 237-246, 2009 | 5 | 2009 |
Multi-approach global stability assessment of soil nail walls, in indian geotechnical conference VP Singh Springer, 2021 | 2 | 2021 |
Soil stabilization using pozzolonic materials K Bajaj, Y Shrivastava, VP Singh Proceedings of Indian Geotechnical Conference December, 15-17, 2011 | 2 | 2011 |
Adequacy of field pullout testing of soil nails GL Sivakumar Babu, VP Singh Georisk: Assessment and Management of Risk for Engineered Systems and …, 2010 | 2* | 2010 |
Alluvial soils as subgrade material: Laboratory and statistical evaluation VP Singh Georisk: Assessment and Management of Risk for Engineered Systems and …, 2009 | 2* | 2009 |
Back analyses in geotechnical engineering GL Sivakumar Babu, VP Singh Forensic Geotechnical Engineering, Edited by VVS Rao and GL Sivakumar Babu …, 2016 | 1 | 2016 |
Analytical hierarchy process based stability assessment of soil nailed structures VP Singh International Journal of Geotechnical Engineering, 1-11, 2024 | | 2024 |
A Strategy for Implementation of Project-Based Learning in Civil Engineering Curriculum VP Singh Journal of Engineering Education Transformations 37 (3), 2024 | | 2024 |