Henk Zijm
Henk Zijm
Full professor Production and Supply Chain Management
Verified email at utwente.nl
Title
Cited by
Cited by
Year
Warehouse design and control: Framework and literature review
B Rouwenhorst, B Reuter, V Stockrahm, GJ van Houtum, RJ Mantel, ...
European journal of operational research 122 (3), 515-533, 2000
8452000
Models for warehouse management: Classification and examples
JP Van den Berg, WHM Zijm
International journal of production economics 59 (1-3), 519-528, 1999
5041999
Materials coordination in stochastic multi-echelon systems
GJ Van Houtum, K Inderfurth, WHM Zijm
European Journal of Operational Research 95 (1), 1-23, 1996
2011996
Analysis of the asymmetric shortest queue problem
I Adan, J Wessels, WHM Zijm
Department of Mathematics and Computing Science, University of Technology, 1990
1651990
Towards intelligent manufacturing planning and control systems
WHM Zijm
OR-Spektrum 22 (3), 313-345, 2000
1402000
Order acceptance strategies in a production-to-order environment with setup times and due-dates
FAW Wester, J Wijngaard, WHM ZIJM
International journal of production research 30 (6), 1313-1326, 1992
1301992
Spare parts management at complex technology-based organizations: An agenda for research
WD Rustenburg, GJ van Houtum, WHM Zijm
International journal of production economics 71 (1-3), 177-193, 2001
1292001
Bubble puzzles
D Lohse, WHM Zijm
Physics Today 56 (2), 36-41, 2003
1222003
Production preparation and numerical control in PCB assembly
PJM Van Laarhoven, WHM Zijm
International Journal of Flexible Manufacturing Systems 5 (3), 187-207, 1993
1121993
Reconfigurable layout problem
G Meng, SS Heragu*, H Zijm
International Journal of Production Research 42 (22), 4709-4729, 2004
1012004
COMPUTATIONAL PROCEDURES FOR STOCHASTIC MULTI-ECHELON PRODUCTION SYSTEMS
GJ Van Houtum, WHM Zijm
971990
An analytical theory of multi-echelon production/distribution systems
WHMZ L.J.G. Langenhoff
Statistica Neerlandica 44 (3), 149-174, 1990
851990
A compensation approach for two-dimensional Markov processes
IJBF Adan, J Wessels, WHM Zijm
Advances in Applied Probability, 783-817, 1993
811993
On the relationship between cost and service models for general inventory systems
GJ Van Houtum, WHM Zijm
Statistica Neerlandica 54 (2), 127-147, 2000
782000
Capacity planning and lead time management
WHM Zijm, R Buitenhek
International Journal of Production Economics 46, 165-179, 1996
761996
Single-machine scheduling with release dates, due dates and family setup times
JMJ Schutten, SL Van de Velde, WHM Zijm
Management Science 42 (8), 1165-1174, 1996
711996
Lecture Notes in Economics and Mathematical Systems 591
M Beckmann, HP Künzi, G Fandel, W Trockel
62*1977
Selecting parts for additive manufacturing in service logistics
N Knofius, MC Van der Heijden, WHM Zijm
Journal of manufacturing technology management, 2016
612016
The integration of process planning and shop floor scheduling in small batch part manufacturing
WHM Zijm, HJJ Kals
CIRP annals 44 (1), 429-432, 1995
611995
Spare parts management for technical systems: resupply of spare parts under limited budgets
WD Rustenburg, GJ van Houtum, WHM Zijm
IIE transactions 32 (10), 1013-1026, 2000
562000
The system can't perform the operation now. Try again later.
Articles 1–20