Volgen
Steef van de Velde
Steef van de Velde
Professor of Operations Management, Rotterdam School of Management, Erasmus University
Geverifieerd e-mailadres voor rsm.nl
Titel
Geciteerd door
Geciteerd door
Jaar
Scheduling a batching machine
P Brucker, A Gladky, H Hoogeveen, MY Kovalyov, CN Potts, ...
Journal of scheduling 1 (1), 31-54, 1998
6151998
Product modularity and the design of closed-loop supply chains
H Krikke, I Blanc, S van de Velde
California management review 46 (2), 23-39, 2004
4542004
Order batching to minimize total travel time in a parallel-aisle warehouse
N Gademann, S Velde
IIE transactions 37 (1), 63-75, 2005
4442005
An iterated dynasearch algorithm for the single-machine total weighted tardiness scheduling problem
RK Congram, CN Potts, SL van de Velde
INFORMS Journal on Computing 14 (1), 52-67, 2002
3922002
Efficacy and safety of lamotrigine as add-on treatment to lithium in bipolar depression: a multicenter, double-blind, placebo-controlled trial.
MLM van der Loos, PGH Mulder, EGTM Hartong, MBJ Blom, ...
Journal of Clinical Psychiatry 70 (2), 223, 2009
2892009
Linking warehouse complexity to warehouse planning and control structure: an exploratory study of the use of warehouse management information systems
N Faber, SL Van de Velde
International Journal of Physical Distribution & Logistics Management 32 (5 …, 2002
2512002
Complexity of scheduling multiprocessor tasks with prespecified processor allocations
JA Hoogeveen, SL van de Velde, B Veltman
Discrete Applied Mathematics 55 (3), 259-272, 1994
2321994
Parallel machine scheduling by column generation
JM van Den Akker, JA Hoogeveen, SL van de Velde
Operations research 47 (6), 862-872, 1999
2201999
Scheduling around a small common due date
JA Hoogeveen, SL Van de Velde
European Journal of Operational Research 55 (2), 237-242, 1991
1861991
Minimizing makespan in a class of reentrant shops
MY Wang, SP Sethi, SL van de Velde
Operations Research 45 (5), 702-712, 1997
1481997
Minimizing total completion time and maximum cost simultaneously is solvable in polynomial time
JA Hoogeveen, SL van de Velde
Operations Research Letters 17 (5), 205-208, 1995
1191995
Multi-product lot-sizing with a transportation capacity reservation contract
L van Norden, S van de Velde
European Journal of Operational Research 165 (1), 127-138, 2005
1102005
Scheduling identical jobs on uniform parallel machines
MI Dessouky, BJ Lageweg, JK Lenstra, SL van de Velde
Statistica Neerlandica 44 (3), 115-123, 1990
1101990
Duality-based algorithms for scheduling unrelated parallel machines
SL van de Velde
ORSA Journal on Computing 5 (2), 192-205, 1993
1011993
Minimizing the sum of the job completion times in the two-machine flow shop by Lagrangian relaxation
SL Van de Velde
Annals of Operations Research 26, 257-268, 1990
951990
Scheduling deteriorating jobs to minimize makespan
W Kubiak, S van de Velde
Naval Research Logistics (NRL) 45 (5), 511-523, 1998
901998
Single-machine scheduling with release dates, due dates and family setup times
JMJ Schutten, SL Van de Velde, WHM Zijm
Management Science 42 (8), 1165-1174, 1996
881996
Stronger Lagrangian bounds by use of slack variables: applications to machine scheduling problems
JA Hoogeveen, SL Van de Velde
Mathematical Programming 70, 173-190, 1995
881995
A branch-and-bound algorithm for single-machine earliness–tardiness scheduling with idle time
JA Hoogeveen, SL van de Velde
INFORMS Journal on Computing 8 (4), 402-412, 1996
781996
Combining column generation and Lagrangean relaxation to solve a single-machine common due date problem
M Van den Akker, H Hoogeveen, S van de Velde
INFORMS Journal on Computing 14 (1), 37-51, 2002
692002
Het systeem kan de bewerking nu niet uitvoeren. Probeer het later opnieuw.
Artikelen 1–20