Volgen
Ritesh Kumar Singh
Titel
Geciteerd door
Geciteerd door
Jaar
Implementing the Lean Sigma framework in an Indian SME: a case study
M Kumar, J Antony, RK Singh, MK Tiwari, D Perry
Production Planning and Control 17 (4), 407-423, 2006
6842006
A fuzzy TOPSIS based approach for e-sourcing
RK Singh, L Benyoucef
Engineering Applications of Artificial Intelligence 24 (3), 437-448, 2011
1592011
Justification for the selection of a reconfigurable manufacturing system: a fuzzy analytical hierarchy based approach
RK Singh, N Khilwani, MK Tiwari
International Journal of Production Research 45 (14), 3165-3190, 2007
1052007
Lean tool selection in a die casting unit: a fuzzy-based decision support heuristic
RK Singh, S Kumar, AK Choudhury, MK Tiwari
International journal of production research 44 (7), 1399-1429, 2006
922006
A consensus based group decision making methodology for strategic selection problems of supply chain coordination
RK Singh, L Benyoucef
Engineering Applications of Artificial Intelligence 26 (1), 122-134, 2013
712013
An integrated fuzzy-based decision support system for the selection of lean tools: a case study from the steel industry
RK Singh, AK Choudhury, MK Tiwari, RS Maull
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2006
562006
Improved Decision Neural Network (IDNN) based consensus method to solve a multi-objective group decision making problem
RK Singh, AK Choudhury, MK Tiwari, R Shankar
Advanced Engineering Informatics 21 (3), 335-348, 2007
352007
Psycho-clonal based approach to solve a TOC product mix decision problem
RK Singh, Prakash, S Kumar, MK Tiwari
The International Journal of Advanced Manufacturing Technology 29, 1194-1202, 2006
312006
TOC approach for supply chain performance enhancement
B Ainapur, RK Singh, PR Vittal
LAP LAMBERT Academic Publishing, 2015
252015
Optimisation of green sand casting process parameters for enhancing quality of mild steel castings
SK Tiwari, RK Singh, SC Srivastava
International Journal of Productivity and Quality Management 17 (2), 127-141, 2016
232016
Fuzzy logic and interval arithmetic-based TOPSIS method for multicriteria reverse auctions
RK Singh, L Benyoucef
Service Science 4 (2), 101-117, 2012
212012
Facility location selection using extent fuzzy AHP
RK Singh
Int. Advanced Research J. in Science, Engineering and Technology 3 (2), 2016
172016
Strategic Study on Enhancement of Supply Chain Performance.
B Ainapur, RK Singh, PR Vittal
International Journal of Business Insights & Transformation 5 (1), 2011
122011
Implementing lean paradigm in an Indian foundry facility: a case study
SK Tiwari, RK Singh, SC Srivastava
International Journal of Services and Operations Management 36 (1), 20-41, 2020
72020
SUPPLY CHAIN PERFORMANCE ENHANCEMENT USING TOC-ENTROPY-GP APPLICATION
B Ainapur, RK Singh, PR Vittal
The International Journal of Management 1 (4), 1-19, 2012
52012
Sequential metamodelling application to improve porthole die design
MK Pandey, RK Singh, S Venkataramanaiah, MK Tiwari
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2010
52010
Simultaneous parametric optimization of micro-EDM drilling of brass C360 using Taguchi based grey relation analysis
P Kumar, LN Pattanaik, RK Singh
Engineering Review: Međunarodni časopis namijenjen publiciranju originalnih …, 2021
42021
Reduction of reworks in green sand casting process: a six sigma prospective
SK Tiwari, RK Singh, SC Srivatava
International Journal of Applied Engineering Research 11 (5), 3141-3150, 2016
42016
Optimizing PM Intervals for Manufacturing Industries Using Delay-time Analysis and MOGA.
SK Tiwari, RK Singh, B Kumar
Jordan Journal of Mechanical & Industrial Engineering 16 (3), 2022
32022
An integrated lean six sigma model for enhancing the competitive advantage of industries
SK Tiwari, RK Singh, SC Srivastava
Recent Advances in Industrial Production: Select Proceedings of ICEM 2020 …, 2022
32022
Het systeem kan de bewerking nu niet uitvoeren. Probeer het later opnieuw.
Artikelen 1–20