Follow
Engin Topan
Title
Cited by
Cited by
Year
A review of operational spare parts service logistics in service control towers
E Topan, AS Eruguz, W Ma, MC van der Heijden, R Dekker
European journal of operational research 282 (2), 401-414, 2020
562020
An exact solution procedure for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse
E Topan, ZP Bayındır, T Tan
Operations Research Letters 38 (5), 454-461, 2010
542010
Using imperfect advance demand information in lost-sales inventory systems with the option of returning inventory
E Topan, T Tan, GJ van Houtum, R Dekker
IISE Transactions 50 (3), 246-264, 2018
472018
Using supervised machine learning for B2B sales forecasting: A case study of spare parts sales forecasting at an after-sales service provider
D Rohaan, E Topan, CGM Groothuis-Oudshoorn
Expert systems with applications 188, 115925, 2022
462022
Heuristics for multi-item two-echelon spare parts inventory control subject to aggregate and individual service measures
E Topan, ZP Bayındır, T Tan
European Journal of Operational Research 256 (1), 126-138, 2017
372017
Operational level planning of a multi-item two-echelon spare parts inventory system with reactive and proactive interventions
E Topan, MC van der Heijden
European journal of operational research 284 (1), 164-175, 2020
342020
Application of data-driven models to predictive maintenance: Bearing wear prediction at TATA steel
X Chen, J Van Hillegersberg, E Topan, S Smith, M Roberts
Expert systems with applications 186, 115699, 2021
332021
Weighted earliness/tardiness parallel machine scheduling problem with a common due date
OA Arık, M Schutten, E Topan
Expert systems with applications 187, 115916, 2022
252022
Multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse under compound Poisson demand
E Topan, ZP Bayindir
Journal of the Operational Research Society 63 (8), 1143-1152, 2012
222012
Operational planning in service control towers–heuristics and case study
B Gerrits, E Topan, MC Van Der Heijden
European Journal of Operational Research 302 (3), 983-998, 2022
152022
An approximation for kanban controlled assembly systems
E Topan, ZM Avṣar
Annals of Operations Research 182, 133-162, 2011
112011
Additive manufacturing in the spare parts supply chain
B Wullms, JJ Arts, EE Topan, H van der Schoot, J Schindler-Chaloub
Eindhoven Univ. Tech 11, 85, 2014
102014
Machine tools with hidden defects: Optimal usage for maximum lifetime value
A Akcay, E Topan, GJ van Houtum
IISE Transactions 53 (1), 74-87, 2021
72021
Using imperfect advance demand information in lost-sales inventory systems
E Topan, T Tan, G van Houtum, R Dekker
Technische Universiteit Eindhoven, 2016
72016
Heuristics for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse
E Topan, ZP Bayindir, T Tan
Technische Universiteit Eindhoven, 2010
62010
Development of a repair cost calculation model for DAF trucks NV using the CRISP-DM framework
V Tumelaire, E Topan, A Wilbik
Master’s thesis, Eindhoven University of Technology, 2015
22015
An approximate model for kanban controlled assembly systems
E Topan
Middle East Technical University, 2005
12005
Real-time alert generation and operational interventions in a closed loop supply chain for repairable parts
K Alizadeh, E Topan, M van der Heijden, J van Hillegersberg
2023
Predicting the spread of covid-19 and the impact of government measures at the early stage of the pandemic: The Dutch case—Stricter but short-term measures are better
CJ Tenhagen, E Topan, KCGM Groothuis-Oudshoorn
Plos one 18 (5), e0283086, 2023
2023
Design for Manufacturing and Supply: An application for Collaborative Manufacturing (COLMAN)
C Ölmezoğlu, İ Teymurlu, E Topan, C Soyarslan
Proceedings of the 27th International Symposium on Logistics, https://drive …, 2023
2023
The system can't perform the operation now. Try again later.
Articles 1–20