Follow
Douniel Lamghari-Idrissi
Douniel Lamghari-Idrissi
Verified email at tue.nl
Title
Cited by
Cited by
Year
Spare parts inventory control under a fixed-term contract with a long-down constraint
D Lamghari-Idrissi, R Basten, GJ van Houtum
International Journal of Production Economics 219, 123-137, 2020
192020
A new after-sales service measure for stable customer operations
DPT Lamghari-Idrissi
92021
Which Spare Parts Service Measure to Choose for a Front-end Wafer Fab?
D Lamghari-idrissi, R Basten, N Dellaert, GJ van Houtum
IEEE Transactions on Semiconductor Manufacturing, 2020
72020
Reducing risks in spare parts service contracts with a long downtime constraint
D Lamghari-Idrissi, R Basten, GJ van Houtum
IISE Transactions 53 (10), 1067-1080, 2021
62021
Increasing chip availability through a new after-sales service supply concept at ASML
D Lamghari-Idrissi, R van Hugten, GJ van Houtum, R Basten
INFORMS Journal on Applied Analytics 52 (5), 460-470, 2022
52022
Influence of spare parts service measures on the performance of front-end wafer production process
D Lamghari-Idrissi, DH Soellaart, RJI Basten, NP Dellaert
Proceedings of the 2019 Winter Simulation conference, 2269-2280, 2019
52019
Component redesigns and the impact of their implementation policy
S Neefs, D Lamghari-Idrissi, R Basten, GJ van Houtum
2023 Winter Simulation Conference (WSC), 2242-2253, 2023
2023
Global Environmental Management Initiative-metrics navigator
DPT Lamghari-Idrissi
The Metrics Navigator, 2007
2007
PAPERS FROM THE 2019 MASM/WSC CONFERENCE
JH Lee, Y Kim, YB Kim, BH Kim, GH Jung, HJ Kim, D Lamghari-Idrissi, ...
The system can't perform the operation now. Try again later.
Articles 1–9