The nuclear medicine production and delivery problem J Lee, BI Kim, AL Johnson, K Lee European Journal of Operational Research 236 (2), 461-472, 2014 | 63 | 2014 |
Industrial ship routing problem with split delivery and two types of vessels J Lee, BI Kim Expert Systems with Applications 42 (22), 9012-9023, 2015 | 37 | 2015 |
A two-dimensional bin packing problem with size changeable items for the production of wind turbine flanges in the open die forging industry J Lee, BI Kim, AL Johnson IIE Transactions 45 (12), 1332-1344, 2013 | 12 | 2013 |
Exact algorithm for the capacitated team orienteering problem with time windows J Park, J Lee, SH Ahn, J Bae, H Tae Mathematical Problems in Engineering 2017, 2017 | 10 | 2017 |
Storage prioritization by redistributing wafer lot transfers to enhance real-world fab throughput H Kim, J Park, J Lee Flexible Services and Manufacturing Journal 35 (3), 599-625, 2023 | | 2023 |
반도체 FAB 에서 웨이퍼 로트 적기운반을 위한 재공 저장 위치 선정 연구 김해중, 이종성 경영과학 38 (1), 47-55, 2021 | | 2021 |
Agent-Based COVID-19 Simulation Considering Dynamic Movement: Changes of Infections According to Detect Levels J Lee Journal of the Korea Society for Simulation 30 (1), 43-54, 2021 | | 2021 |
Bus stop passenger waiting simulation considering transfer passengers: A case study at Cheongju Intercity Bus Terminal J Lee Journal of the Korea Convergence Society 12 (4), 217-228, 2021 | | 2021 |