Gisela Lanza
Gisela Lanza
Prof. Dr.-Ing., wbk Institute of Production Science, Karlsruhe Institute of Technology (KIT)
Verified email at kit.edu - Homepage
Title
Cited by
Cited by
Year
Design and management of manufacturing systems for production quality
M Colledani, T Tolio, A Fischer, B Iung, G Lanza, R Schmitt, J Váncza
Cirp Annals 63 (2), 773-796, 2014
2742014
Assessment of lean and green strategies by simulation of manufacturing systems in discrete production environments
N Diaz-Elsayed, A Jondral, S Greinacher, D Dornfeld, G Lanza
CIRP Annals 62 (1), 475-478, 2013
1472013
Composite materials parts manufacturing
J Fleischer, R Teti, G Lanza, P Mativenga, HC Moehring, A Caggiano
CIRP Annals 67 (2), 603-626, 2018
952018
Optimization of selective assembly and adaptive manufacturing by means of cyber-physical system based matching
G Lanza, B Haefner, A Kraemer
CIRP Annals 64 (1), 399-402, 2015
802015
Quality value stream mapping
B Haefner, A Kraemer, T Stauss, G Lanza
Procedia Cirp 17, 254-259, 2014
802014
Produkte und Produktionssysteme integrativ konzipieren
J Gausemeier, G Lanza, U Lindemann
Modellbildung und Analyse in der frühen Phase der Produktentstehung, München, 2012
682012
Global production networks: Design and operation
G Lanza, K Ferdows, S Kara, D Mourtzis, G Schuh, J Váncza, L Wang, ...
CIRP annals 68 (2), 823-841, 2019
632019
Impact of green machining strategies on achieved surface quality
M Helu, B Behmann, H Meier, D Dornfeld, G Lanza, V Schulze
CIRP annals 61 (1), 55-58, 2012
622012
Optimization of preventive maintenance and spare part provision for machine tools based on variable operational conditions
G Lanza, S Niggeschmidt, P Werner
CIRP annals 58 (1), 429-432, 2009
562009
Measuring global production effectiveness
G Lanza, J Stoll, N Stricker, S Peters, C Lorenz
Procedia CIRP 7, 31-36, 2013
472013
Criticality analysis of spare parts management: a multi-criteria classification regarding a cross-plant central warehouse strategy
J Stoll, R Kopf, J Schneider, G Lanza
Production Engineering 9 (2), 225-235, 2015
452015
Befähigungs-und Einführungsstrategien für Industrie 4.0
G Lanza, P Nyhuis, SM Ansari, T Kuprat, C Liebrecht
Zeitschrift für wirtschaftlichen Fabrikbetrieb 111 (1-2), 76-79, 2016
432016
Company-specific quantitative evaluation of lean production methods
K Peter, G Lanza
Production Engineering 5 (1), 81-87, 2011
422011
Sustainability optimization for global supply chain decision-making
R Bhinge, R Moser, E Moser, G Lanza, D Dornfeld
Procedia Cirp 26, 323-328, 2015
412015
Simulationsbasierte Anlaufunterstützung auf der Basis der Qualitätsfähigkeiten von Produktionsprozessen
G Lanza
Wbk, Inst. für Produktionstechnik, 2005
412005
The concept of robustness in production systems and its correlation to disturbances
N Stricker, G Lanza
Procedia CIRP 19, 87-92, 2014
382014
Staff scheduling in job rotation environments considering ergonomic aspects and preservation of qualifications
J Hochdörffer, M Hedler, G Lanza
Journal of manufacturing systems 46, 103-114, 2018
352018
Simulation based assessment of lean and green strategies in manufacturing systems
S Greinacher, E Moser, H Hermann, G Lanza
Procedia Cirp 29, 86-91, 2015
352015
Multi-objective optimization of global manufacturing networks taking into account multi-dimensional uncertainty
G Lanza, R Moser
CIRP Annals 63 (1), 397-400, 2014
352014
Integrated capacity planning over highly volatile horizons
G Lanza, S Peters
CIRP annals 61 (1), 395-398, 2012
322012
The system can't perform the operation now. Try again later.
Articles 1–20