Pressure propagation and flow restart in a pipeline filled with a gas pocket separated rheomalaxis elasto-viscoplastic waxy gel L Tikariha, L Kumar Journal of Non-Newtonian Fluid Mechanics 294, 104582, 2021 | 15 | 2021 |
Pressure propagation and flow restart in the multi-plug gelled pipeline L Tikariha, L Kumar Journal of Fluid Mechanics 911, A46, 2021 | 12 | 2021 |
The effects of partial preheating on pressure propagation and Flow-Restart phenomena in a clogged pipeline with a weakly compressible gel A Sanyal, L Tikariha, L Kumar Physics of Fluids 33 (4), 2021 | 10 | 2021 |
Numerical study of gelation and flow restart in a waxy crude oil riser L Tikariha, A Sanyal, L Kumar Journal of Petroleum Science and Engineering 217, 110871, 2022 | 3 | 2022 |
Experimental and numerical investigation of the degelation behavior and non-isothermal flow restart of a waxy oil pipeline SB Shinde, L Tikariha, L Kumar ACS omega 8 (29), 25972-25987, 2023 | 2 | 2023 |
Wastewater Disinfection Using Peracids: Simulation of System Performance and Process Control Alternatives Using Batch Inactivation Kinetics from a 10-Plant North American Study Y Lawryshyn, L Tikariha, JN John, AD Silva, K Bell, D Santoro WEFTEC 2023, 2023 | | 2023 |
Blockage detection in pipeline by estimating reflected pressure signal velocity in a dissipative medium K Singh, L Tikariha, L Kumar Bulletin of the American Physical Society 67, 2022 | | 2022 |
Transient of flow restart in a gas void embedded gelled pipeline and voids deformation L Tikariha, A Sanyal, L Kumar Bulletin of the American Physical Society 67, 2022 | | 2022 |
Method for restarting flow in waxy crude oil transporting pipeline L Kumar, L Tikariha US Patent App. 17/233,722, 2021 | | 2021 |
Pressure Propagation and Flow Restart in the Subsea Pipeline Network L Tikariha, L Kumar Proceedings of the 7th International Conference on Advances in Energy …, 2021 | | 2021 |
Study of Pressure Propagation Mechanism in the Multi-Plug Gelled Pipeline L Tikariha, L Kumar 2020 Virtual AIChE Annual Meeting, 2020 | | 2020 |
Flow restart in the subsea pipeline network L Tikariha Mumbai, 0 | | |