Bryan Tyrone Adey
Bryan Tyrone Adey
Verified email at ibi.baug.ethz.ch
Title
Cited by
Cited by
Year
Productivity of digital fabrication in construction: Cost and time analysis of a robotically built wall
BG de Soto, I Agustí-Juan, J Hunhevicz, S Joss, K Graser, G Habert, ...
Automation in Construction 92, 297-311, 2018
1512018
Prediction of road accidents: A Bayesian hierarchical approach
M Deublein, M Schubert, BT Adey, J Köhler, MH Faber
Accident Analysis & Prevention 51, 274-291, 2013
1122013
Modeling of corrosion-induced concrete cover cracking: A critical analysis
A Jamali, U Angst, B Adey, B Elsener
Construction and Building Materials 42, 225-237, 2013
1062013
Condition evolution in bridge management systems and corrosion-induced deterioration
G Roelfstra, R Hajdin, B Adey, E Brühwiler
Journal of Bridge Engineering 9 (3), 268-277, 2004
862004
Construction automation: Research areas, industry concerns and suggestions for advancement
Q Chen, BG de Soto, BT Adey
Automation in Construction 94, 22-38, 2018
762018
Concrete cover cracking owing to reinforcement corrosion–theoretical considerations and practical experience
U Angst, B Elsener, A Jamali, B Adey
Materials and corrosion 63 (12), 1069-1077, 2012
702012
Cyclic loading of end plate moment connections
BT Adey, GY Grondin, JJR Cheng
Canadian Journal of Civil Engineering 27 (4), 683-701, 2000
652000
Risk-based approach to the determination of optimal interventions for bridges affected by multiple hazards
B Adey, R Hajdin, E Brühwiler
Engineering structures 25 (7), 903-912, 2003
592003
Methodology and base cost models to determine the total benefits of preservation interventions on road sections in Switzerland
BT Adey, T Herrmann, K Tsafatinos, J Lüking, N Schindele, R Hajdin
Structure and Infrastructure Engineering 8 (7), 639-654, 2012
442012
Use of exponential hidden Markov models for modelling pavement deterioration
N Lethanh, BT Adey
International Journal of Pavement Engineering 14 (7), 645-654, 2013
432013
Supply and demand system approach to development of bridge management strategies
B Adey, R Hajdin, E Brühwiler
Journal of infrastructure systems 9 (3), 117-131, 2003
422003
Determination of near‐optimal restoration programs for transportation networks following natural hazard events using simulated annealing
J Hackl, BT Adey, N Lethanh
Computer‐Aided Civil and Infrastructure Engineering 33 (8), 618-637, 2018
402018
Life-cycle performance of deteriorating structures
DM Frangopol, E Brühwiler, MH Faber, B Adey
American Society of Civil Engineers, 2003
382003
Extended end plate moment connections under cyclic loading
BT Adey, JJ Cheng, GY Grondin
341997
Estimating network related risks: A methodology and an application in the transport sector
J Hackl, JC Lam, M Heitzler, BT Adey, L Hurni
Natural Hazards and Earth System Sciences 18 (8), 2273-2293, 2018
322018
A Bayesian network model to predict accidents on Swiss highways
M Deublein, M Schubert, BT Adey, B García de Soto
Infrastructure Asset Management 2 (4), 145-158, 2015
302015
GPU-accelerated rendering methods to visually analyze large-scale disaster simulation data
M Heitzler, JC Lam, J Hackl, BT Adey, L Hurni
Journal of Geovisualization and Spatial Analysis 1 (1), 1-18, 2017
292017
Overview of existing bridge management systems
Z Mirzaei, BT Adey, L Klatter, PD Thompson
Bridge Management Committee, IABMAS, 2014
282014
Using a Tabu-search algorithm and 4D models to improve construction project schedules
BG de Soto, A Rosarius, J Rieger, Q Chen, BT Adey
Procedia Engineering 196, 698-705, 2017
272017
Ensuring acceptable levels of infrastructure related risks due to natural hazards with emphasis on conducting stress tests
BT Adey, J Hackl, JC Lam, P Van Gelder, P Prak, N Van Erp, M Heitzler, ...
Proceedings of the 1st International Symposium on Infrastructure Asset …, 2016
272016
The system can't perform the operation now. Try again later.
Articles 1–20