Follow
Vinícius Amaral Armentano
Vinícius Amaral Armentano
Professor da Faculdade de Engenharia Elétrica e de Computação da Universidade Estadual de Campinas
Verified email at densis.fee.unicamp.br
Title
Cited by
Cited by
Year
Pesquisa operacional
M Arenales, VA Armentano, R Morabito, HH Yanasse
Campus/elsevier, 2007
7642007
Genetic local search for multi-objective flowshop scheduling problems
JEC Arroyo, VA Armentano
European journal of operational research 167 (3), 717-738, 2005
2372005
Tabu search with path relinking for an integrated production–distribution problem
VA Armentano, AL Shiguemoto, A Løkketangen
Computers & Operations Research 38 (8), 1199-1209, 2011
2212011
Tabu search for total tardiness minimization in flowshop scheduling problems
VA Armentano, DP Ronconi
Computers & operations research 26 (3), 219-235, 1999
1791999
Tardiness minimization in a flexible job shop: A tabu search approach
CR Scrich, VA Armentano, M Laguna
Journal of intelligent manufacturing 15, 103-115, 2004
1472004
Scatter search for project scheduling with resource availability cost
DS Yamashita, VA Armentano, M Laguna
European journal of operational research 169 (2), 623-637, 2006
1362006
A Lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines
FMB Toledo, VA Armentano
European Journal of Operational Research 175 (2), 1070-1083, 2006
1252006
Adaptive granular local search heuristic for a dynamic vehicle routing problem
RM Branchini, VA Armentano, A Løkketangen
Computers & Operations Research 36 (11), 2955-2968, 2009
1222009
Tabu search for minimizing total tardiness in a job shop
VA Armentano, CR Scrich
International journal of production economics 63 (2), 131-140, 2000
1212000
Lower bounding schemes for flowshops with blocking in-process
DP Ronconi, VA Armentano
Journal of the Operational Research Society 52 (11), 1289-1297, 2001
1162001
Robust optimization models for project scheduling with resource availability cost
DS Yamashita, VA Armentano, M Laguna
Journal of scheduling 10, 67-76, 2007
1142007
The Pencil and Controllability–Observability for Generalized Linear Systems: a Geometric Approach
VA Armentano
SIAM journal on control and optimization 24 (4), 616-638, 1986
1041986
A heuristic for single machine scheduling with early and tardy costs
R Mazzini, VA Armentano
European Journal of Operational Research 128 (1), 129-146, 2001
932001
A heuristic method for lot-sizing in multi-stage systems
PM França, VA Armentano, RE Berretta, AR Clark
Computers & operations research 24 (9), 861-874, 1997
921997
Eigenvalue placement for generalized linear systems
VA Armentano
Systems & control letters 4 (4), 199-202, 1984
871984
Tabu search for scheduling on identical parallel machines to minimize mean tardiness
VA Armentano, DS Yamashita
Journal of intelligent manufacturing 11, 453-460, 2000
812000
An application of a multi-objective tabu search algorithm to a bicriteria flowshop problem
VA Armentano, JE Claudio
Journal of Heuristics 10, 463-481, 2004
802004
A genetic algorithm for scheduling on a single machine with set-up times and due dates
VA Armentano, R Mazzini
Production Planning & Control 11 (7), 713-720, 2000
762000
Minimizing total tardiness in parallel machine scheduling with setup times: An adaptive memory-based GRASP approach
VA Armentano, MF de França Filho
European Journal of Operational Research 183 (1), 100-114, 2007
742007
A heuristic for a resource-capacitated multi-stage lot-sizing problem with lead times
AR Clark, VA Armentano
Journal of the Operational research Society, 1208-1222, 1995
711995
The system can't perform the operation now. Try again later.
Articles 1–20