Volgen
Lars Moench
Lars Moench
Professor of Computer Science, University of Hagen
Geverifieerd e-mailadres voor fernuni-hagen.de
Titel
Geciteerd door
Geciteerd door
Jaar
A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations
L Mönch, JW Fowler, S Dauzère-Pérès, SJ Mason, O Rose
Journal of scheduling 14, 583-599, 2011
4562011
Production Planning and Control for Semiconductor Wafer Fabrication Facilities
L Mönch, JW Fowler, SJ Mason
Springer, 2013
307*2013
Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
L Mönch, H Balasubramanian, JW Fowler, ME Pfund
Computers & Operations Research 32 (11), 2731-2750, 2005
2602005
Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness
H Balasubramanian, L Mönch, J Fowler, M Pfund
International Journal of Production Research 42 (8), 1621-1638, 2004
1892004
A survey of semiconductor supply chain models part I: semiconductor supply chains, strategic network design, and supply chain simulation
L Mönch, R Uzsoy, JW Fowler
International Journal of Production Research 56 (13), 4524-4545, 2018
1342018
Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops
L Mönch, R Schabacker, D Pabst, JW Fowler
European Journal of Operational Research 177 (3), 2100-2118, 2007
1302007
Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes
CF Chien, S Dauzère-Pérès, H Ehm, JW Fowler, Z Jiang, ...
European Journal of Industrial Engineering 4 5 (3), 254-271, 2011
1262011
A distributed shifting bottleneck heuristic for complex job shops
L Mönch, R Drießel
Computers & Industrial Engineering 49 (3), 363-380, 2005
1082005
Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times
R Driessel, L Mönch
Computers & Industrial Engineering 61 (2), 336-345, 2011
1032011
On the inverse acoustic scattering problem by an open arc: the sound-hard case
L Mönch
Inverse Problems 13 (5), 1379, 1997
1021997
Machine learning techniques for scheduling jobs with incompatible families and unequal ready times on parallel batch machines
L Mönch, J Zimmermann, P Otto
Engineering Applications of Artificial Intelligence 19 (3), 235-245, 2006
992006
Simulation-based benchmarking of production control schemes for complex manufacturing systems
L Mönch
Control Engineering Practice 15 (11), 1381-1393, 2007
962007
Hybrid algorithms for the vehicle routing problem with clustered backhauls and 3D loading constraints
A Bortfeldt, T Hahn, D Männel, L Mönch
European Journal of Operational Research 243 (1), 82-96, 2015
922015
A survey of scheduling with parallel batch (p-batch) processing
JW Fowler, L Mönch
European journal of operational research 298 (1), 1-24, 2022
912022
Planning wafer starts using nonlinear clearing functions: A large-scale experiment
NB Kacar, L Mönch, R Uzsoy
IEEE Transactions on Semiconductor Manufacturing 26 (4), 602-612, 2013
842013
A survey of semiconductor supply chain models part III: master planning, production planning, and demand fulfilment
L Mönch, R Uzsoy, JW Fowler
International Journal of Production Research 56 (13), 4565-4584, 2018
822018
Heuristics for vehicle routing problems with backhauls, time windows, and 3D loading constraints
S Reil, A Bortfeldt, L Mönch
European Journal of Operational Research 266 (3), 877-894, 2018
822018
A simulation framework for the performance assessment of shop-floor control systems
L Mönch, O Rose, R Sturm
Simulation-Transactions of the Society for Modeling and Simulation …, 2003
802003
Scheduling jobs with time constraints between consecutive process steps in semiconductor manufacturing
A Klemmt, L Mönch
Proceedings of the 2012 winter simulation conference (WSC), 1-10, 2012
782012
Modeling cycle times in production planning models for wafer fabrication
NB Kacar, L Mönch, R Uzsoy
IEEE Transactions on Semiconductor Manufacturing 29 (2), 153-167, 2016
732016
Het systeem kan de bewerking nu niet uitvoeren. Probeer het later opnieuw.
Artikelen 1–20