Lead time prediction using machine learning algorithms: A case study by a semiconductor manufacturer L Lingitz, V Gallina, F Ansari, D Gyulai, A Pfeiffer, W Sihn, L Monostori Procedia Cirp 72, 1051-1056, 2018 | 180 | 2018 |
Stability-oriented evaluation of rescheduling strategies, by using simulation A Pfeiffer, B Kádár, L Monostori Computers in Industry 58 (7), 630-643, 2007 | 118 | 2007 |
Lead time prediction in a flow-shop environment with analytical and machine learning approaches D Gyulai, A Pfeiffer, G Nick, V Gallina, W Sihn, L Monostori IFAC-PapersOnLine 51 (11), 1029-1034, 2018 | 101 | 2018 |
Enhanced control of complex production structures by tight coupling of the digital and the physical worlds B Kádár, A Lengyel, L Monostori, Y Suginishi, A Pfeiffer, Y Nonaka CIRP annals 59 (1), 437-440, 2010 | 82 | 2010 |
Milkrun vehicle routing approach for shop-floor logistics D Gyulai, A Pfeiffer, T Sobottka, J Váncza Procedia Cirp 7, 127-132, 2013 | 81 | 2013 |
Manufacturing lead time estimation with the combination of simulation and statistical learning methods A Pfeiffer, D Gyulai, B Kádár, L Monostori Procedia Cirp 41, 75-80, 2016 | 71 | 2016 |
Discrete event simulation for supporting production planning and scheduling decisions in digital factories B Kádár, A Pfeiffer, L Monostori Proceedings of the 37th CIRP international seminar on manufacturing systems …, 2004 | 67 | 2004 |
Solution approaches to real-time control of customized mass production L Monostori, B Kádár, A Pfeiffer, D Karnok CIRP annals 56 (1), 431-434, 2007 | 61 | 2007 |
Data analytics-based decision support workflow for high-mix low-volume production systems I Gödri, C Kardos, A Pfeiffer, J Váncza CIRP Annals 68 (1), 471-474, 2019 | 57 | 2019 |
Robust production planning and control for multi-stage systems with flexible final assembly lines D Gyulai, A Pfeiffer, L Monostori International Journal of Production Research 55 (13), 3657-3673, 2017 | 56 | 2017 |
Towards adaptive and digital manufacturing L Monostori, BC Csáji, B Kádár, A Pfeiffer, E Ilie-Zudor, Z Kemény, ... Annual reviews in Control 34 (1), 118-128, 2010 | 55 | 2010 |
Digital enterprise solution for integrated production planning and control L Monostori, G Erdős, B Kádár, T Kis, A Kovács, A Pfeiffer, J Váncza Computers in Industry 61 (2), 112-126, 2010 | 51 | 2010 |
Supporting multi-level and robust production planning and execution N Stricker, A Pfeiffer, E Moser, B Kádár, G Lanza, L Monostori CIRP Annals 64 (1), 415-418, 2015 | 32 | 2015 |
Generic data structure and validation methodology for simulation of manufacturing systems G Popovics, A Pfeiffer, L Monostori International Journal of Computer Integrated Manufacturing 29 (12), 1272-1286, 2016 | 31 | 2016 |
Online lead time prediction supporting situation-aware production control D Gyulai, A Pfeiffer, J Bergmann, V Gallina Procedia CIRP 78, 190-195, 2018 | 30 | 2018 |
Matching demand and system structure in reconfigurable assembly systems D Gyulai, Z Vén, A Pfeiffer, J Váncza, L Monostori Procedia CIRP 3, 579-584, 2012 | 30 | 2012 |
Evaluating and improving production control systems by using emulation A Pfeiffer, B Kádár, L Monostori Applied Simulation and Modelling, 2003 | 28 | 2003 |
Simulation as one of the core technologies for digital enterprises: assessment of hybrid rescheduling methods A Pfeiffer, B Kádár, L Monostori, D Karnok International Journal of Computer Integrated Manufacturing 21 (2), 206-214, 2008 | 25 | 2008 |
Simulation-based production planning and execution control for reconfigurable assembly cells D Gyulai, A Pfeiffer, B Kádár, L Monostori Procedia Cirp 57, 445-450, 2016 | 24 | 2016 |
Real-life scheduling using constraint programming and simulation A Kovács, J Váncza, B Kádár, L Monostori, A Pfeiffer IFAC Proceedings Volumes 36 (3), 233-238, 2003 | 22 | 2003 |