Follow
Dirk Schwanenberg
Dirk Schwanenberg
KISTERS AG
Verified email at uni-due.de
Title
Cited by
Cited by
Year
Advancing data assimilation in operational hydrologic forecasting: progresses, challenges, and emerging opportunities
Y Liu, AH Weerts, M Clark, HJ Hendricks Franssen, S Kumar, ...
Hydrology and earth system sciences 16 (10), 3863-3887, 2012
4442012
Discontinuous Galerkin finite-element method for transcritical two-dimensional shallow water flows
D Schwanenberg, M Harms
Journal of Hydraulic Engineering 130 (5), 412-421, 2004
1332004
A discontinuous Galerkin method for the shallow water equations with source terms
D Schwanenberg, J Köngeter
Discontinuous Galerkin Methods: Theory, Computation and Applications, 419-424, 2000
982000
Short-term reservoir optimization for flood mitigation under meteorological and hydrological forecast uncertainty
D Schwanenberg, FM Fan, S Naumann, JI Kuwajima, RA Montero, ...
Water Resources Management 29 (5), 1635-1651, 2015
902015
Experimental and numerical investigations of dike-break induced flows
S Roger, BJ Dewals, S Erpicum, D Schwanenberg, H Schüttrumpf, ...
Journal of Hydraulic Research 47 (3), 349-359, 2009
902009
Short-term optimal operation of water systems using ensemble forecasts
L Raso, D Schwanenberg, NC van de Giesen, PJ van Overloop
Advances in water resources 71, 200-208, 2014
872014
Verification of inflow into hydropower reservoirs using ensemble forecasts of the TIGGE database for large scale basins in Brazil
FM Fan, D Schwanenberg, W Collischonn, A Weerts
Journal of Hydrology: Regional Studies 4, 196-227, 2015
682015
Optimal real-time operation of multipurpose urban reservoirs: Case study in Singapore
S Galelli, A Goedbloed, D Schwanenberg, PJ van Overloop
Journal of Water Resources Planning and Management 140 (4), 511-523, 2014
682014
Performance of deterministic and probabilistic hydrological forecasts for the short-term optimization of a tropical hydropower reservoir
FM Fan, D Schwanenberg, R Alvarado, A Assis dos Reis, W Collischonn, ...
Water Resources Management 30, 3609-3625, 2016
642016
Coupled 1D–3D hydrodynamic modelling, with application to the Pearl River Delta
DJ Twigt, ED De Goede, F Zijl, D Schwanenberg, AYW Chiu
Ocean Dynamics 59, 1077-1093, 2009
572009
The open real-time control (RTC)-Tools software framework for modeling RTC in water resources sytems
D Schwanenberg, BPJ Becker, M Xu
Journal of Hydroinformatics 17 (1), 130-148, 2015
412015
Real-time modeling for navigation and hydropower in the river Mosel
T Ackermann, DP Loucks, D Schwanenberg, M Detering
Journal of Water Resources Planning and Management 126 (5), 298-303, 2000
402000
Tree structure generation from ensemble forecasts for real time control
L Raso, N Van De Giesen, P Stive, D Schwanenberg, PJ Van Overloop
Hydrological Processes 27 (1), 75-82, 2013
382013
Comparison between two hydrodynamic models for flooding simulations at river Lima basin
J Pinho, R Ferreira, L Vieira, D Schwanenberg
Water resources management 29, 431-444, 2015
332015
Die Runge-Kutta-Discontinuous-Galerkin-Methode zur Lösung konvektionsdominierter tiefengemittelter Flachwasserprobleme
D Schwanenberg
Bibliothek der RWTH Aachen, 2003
322003
Moving horizon estimation for assimilating H-SAF remote sensing data into the HBV hydrological model
RA Montero, D Schwanenberg, P Krahe, D Lisniak, A Sensoy, AA Sorman, ...
Advances in water resources 92, 248-257, 2016
312016
Short-term management of hydropower assets of the Federal Columbia River power system
D Schwanenberg, M Xu, T Ochterbeck, C Allen, D Karimanzira
Journal of Applied Water Engineering and Research 2 (1), 25-32, 2014
312014
Comparison of different reservoir models for short term operation of flood management
G Uysal, B Akkol, MI Topcu, A Sensoy, D Schwanenberg
Procedia Engineering 154, 1385-1392, 2016
282016
Simplified hydraulic modelling in model predictive control of flood mitigation measures along rivers
RA Montero, D Schwanenberg, M Hatz, M Brinkmann
Journal of Applied Water Engineering and Research 1 (1), 17-27, 2013
242013
Short-term hydropower optimization and assessment of operational flexibility
D Karimanzira, D Schwanenberg, C Allen, S Barton
Journal of Water Resources Planning and Management 142 (2), 04015048, 2016
212016
The system can't perform the operation now. Try again later.
Articles 1–20